Repository navigation
Update the bunch spacing in GENIE and MeVPrtl using number measured by MicroBooNE - #419
Conversation
|
Hi @leoaliaga, @jzettle, we would like to update the time between BNB bunches in SBND. We noticed that in ICARUS this is set to 18.8313 ns: We would like to set it to 18.936 ns following MicroBooNE's paper: https://arxiv.org/abs/2304.02076 Shall ICARUS follow this change, or is there a reason for the 18.8313 ns? Thanks! |
|
@marcodeltutto I would ask @PetrilloAtWork to comment on the origin of the ICARUS BNB bunch spacing timing and the impact of making the change on the simulation (I would naively expect minimal) |
|
Considering that the simulation of bunches is mostly broken anyway (at least, the last time I checked there was no correlation between interaction time and location), it's not going to matter much. I do not see any issue with changing it. |
|
We see 18.936ns for BNB in ICARUS data as well, perfectly consistent with MicroBooNE results. No objections on my side to update the simulation settings. |
|
Just to be clear for the ICARUS collaborators who got added to this (of course reviewing is helpful) is that this PR only addresses this for SBND. We would need a corresponding PR in icaruscode or to move to a common setting in sbncode in order to make this change for ICARUS |
Co-authored-by: Matteo Vicenzi <64699641+mvicenzi@users.noreply.github.com>
|
Thank you @jzettle, @PetrilloAtWork, @mvicenzi! @VCLanNguyen This issue describes the limitations @PetrilloAtWork mentioned above, in case this is relevant to your studies. SBNSoftware/sbncode#112 |
|
Thanks everyone for the comment. |
|
Reviewing the code I see that it does appear that the correlation is restored, with GENIE+helper producing the time of the interaction relative to when the proton hits the target (or close to that). That is a change at least three year old, that did not get to my eyes. |
|
trigger build |
|
✔️ CI build for LArSoft Succeeded on slf7 for e26:prof -- details available through the CI dashboard |
|
✔️ CI build for LArSoft Succeeded on slf7 for c14:prof -- details available through the CI dashboard |
|
❌ CI build for SBND Failed at phase build SBND on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build SBND phase logs parent CI build details are available through the CI dashboard |
|
🚨 For more details about the warning phase, check the ci_tests SBND phase logs parent CI build details are available through the CI dashboard |
|
@fjnicolas |
@VCLanNguyen it's unrrelated and due to SBNSoftware/sbncode#388, I'll merge it after approval |
rodralva
left a comment
There was a problem hiding this comment.
Nice catch, also great to have documented where the values come from. Thanks @VCLanNguyen !
The bunch spacing is simulated with a place holder value of 19 ns.

Update to use MicroBooNE number of 18.936 ns.
This is also consistent with SBND measured using the CRT panels in 2017-2018 with bunch spacing = 18.935 ns.